Pipe spooling

Fabrication and reeling of 41/2" pipe comprised pipeline receipt, all fabrication and test activities, intermediate storage and spooling will at Mekjarvik Technology - Metec a.s' facilities. The entire process was performed virtually continuously running, with logical locations of the defined standings sequentially performing the various operations.

All welding and coating was accomplished in-house, well illuminated and under temperated conditions. Several Reels on the jetty (easily repositioned by the crane) end the "assembly line". Roller racks of height 1,2 m above floor (each horizontally equally levelled) assisted supreme welding positions. Handling of the prepared pipe lengths (12m) - inspected, marked, and bevelled is aided by roller table, crane and truck, while the longitudinal movement out of the workshop approaching the reel, was assisted by roller racks. Any repair welds (i.e. welds repaired after 1st NDT) was carried out in-house/ container/ tent.

 

 

Base activities ...
Valomon spool installation Campagn ...

24" 250bar launcher%receiver for Nexen-Scott Project by Saipem/ M ...

SCORE NORWAY New Valves and spools! ...

Wireline deck - a 30ton new installation.

...

AGR Handling Deck for the Riserless Mud Recovery systems.

...

Bumbers design and installation on the Well Test Area.

...

Hutton TLP Anchor Foundation demolishing project.

...

The Yme Beta 4 1/2" spool Project for Stolt Comex/Statoil ...

Endring av Adressefelt!

...
Username :
Password :

 secretery

 

Design by Inbusiness - Powered by www.i-tools.no