alt

"Bumperos"

To protect pipelines, valves and electrical equipment, METEC was awarded the job of designing, fabricate and install bumpers onboard the rig "West Phoenix". The installation was carried out in parallel to the installation of the Wireline Deck.

 

The picture above shows the bumpers installation in the Well Test Area.