Gallery - some of the projects

 

 METEC have deliberately inserted pictures with lots of details (many pixels). This to enable you to zoom for getting a better impression. We recommends to use the Mozilla Firefox enabling you to open pictures in a bigger format (right click and zoom).

 

DSND lifting frame

 

Fabrication of frame on our quay outside work shop.                                                            

METEC HEREOS

During the big and dramatic fire at Mekjarvik,

METEC personnel did a brave effort to save

customer's property.

Joint

DSND lifting frame

Complex joints by Profile Cut Computer Program

 

DSND lifting frame

 

Lifting Frame manufactured and

ready for lifting Pipe Spools

 

DSND lifting frame

 

Mobilisation activities  on  

"Nordica". 

 

 

DSND lifting frame

 

Supports for lifting frame being

installed onboard.

 

Numerical  cutting machine

Table  size  width     6.000 mm

lenght  14.000 mm

 

Mærsk  Norge

 Riser Protections

   

SCORE  Norge

 Valve repair

 Heavy Chain Gutter Fabrication 
   Heavy Chain Gutter Fabrication 

Seaway Falcon

Reel pipe & Emergency  clamp Fabrication

Winch Modification & Services

 

 

 

Base activities ...
Valomon spool installation Campagn ...

24" 250bar launcher%receiver for Nexen-Scott Project by Saipem/ M ...

SCORE NORWAY New Valves and spools! ...

Wireline deck - a 30ton new installation.

...

AGR Handling Deck for the Riserless Mud Recovery systems.

...

Bumbers design and installation on the Well Test Area.

...

Hutton TLP Anchor Foundation demolishing project.

...

The Yme Beta 4 1/2" spool Project for Stolt Comex/Statoil ...

Endring av Adressefelt!

...
Username :
Password :

 secretery

 

Design by Inbusiness - Powered by www.i-tools.no