Clamps and Bracing
           for
     
 

 

TECHNIP awarded a clamp-fabrication work  for the VALOMON project to Metec

The Clamps and bracing was used on a spool installation Campagn

 The fabrication took place september 2014 

    

         

               

 

 click

   

Deliverd to  the Mobilisation campagn 15-20-Sept-2014

click

Base activities ...
Valomon spool installation Campagn ...